Question 1
66-style connecting blocks (certain designs) can support up to what category of transmission performance?
  1. Category 3
  2. Category 5
  3. Category 5e
  4. Category 6
  5. Category 6A
Correct answer: C
Question 2
What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?
  1. Category 5e/class D
  2. Category 6/class E
  3. Category 6A/class EA
  4. Category 7/class F
Correct answer: B
Question 3
A project’s installation start involves a Kickoff Meeting and the General Contractor’s Coordination Meeting. As part of the ICT distribution designer’s responsibilities, which two of the following are key elements of the Kick-off Meeting? (Choose two.)
  1. Project submittal approval process
  2. RFI process
  3. Punch List process
  4. Project start and completion dates
  5. Payment procedures
Correct answer: B, D
Question 4
Based on the estimated work area size, what is the MAXIMUM number of work areas that a telecommunications enclosure shall serve?
  1. 20
  2. 26
  3. 32
  4. 36
  5. 40
Correct answer: E
Question 5
Which two of the following items MUST be included in a detailed SoW? (Choose two.)
  1. How the contract performance will be evaluated/judged
  2. A general description of work to be performed
  3. Who must approve the Scope of Work
  4. When the work will start
  5. What type of work needs to be performed
Correct answer: D, E
Question 6
How many classes of telecommunications administration are there?
  1. 3
  2. 4
  3. 5
  4. 6
Correct answer: B
Question 7
Which two of the following items should be considered for inclusion in a comprehensive working outline of a SoW? (Choose two.)
  1. Legal matters
  2. Contract administration
  3. Financial matters
  4. Technical considerations
  5. Schedule
Correct answer: D, E
Question 8
When designing horizontal pathways, the ICT distribution designer should consider the design’s ability to (Choose two.)
  1. minimize occupant disruption when horizontal pathways are accessed.
  2. handle at least 3 different cabling media types.
  3. accommodate at least 50 percent future growth.
  4. handle only the day one needs as the future is unknown.
  5. accommodate cabling changes.
Correct answer: A, E
Question 9
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?
  1. Confirm all unnecessary items have been removed from the area.
  2. Confirm the device is de-energized by proving it will not run when started.
  3. Train workers to perform the LOTO process.
  4. Apply appropriate tags both locally and remotely.
  5. Verify the equipment controls are in the proper operating position.
Correct answer: B
Question 10
In a building with one joint room for serving as the ER and EF and four dedicated TRs on the same floor, a total of ______ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.
  1. 4
  2. 8
  3. 16
  4. 20
Correct answer: C
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!